A flat-roofed bungalow in Coniston with a failing three-layer felt covering needed a comprehensive waterproofing solution that could be completed quickly before winter. Our Lava20 roofing team applied a reinforced liquid membrane overlay directly over the existing felt, creating a seamless waterproof coating without the disruption of stripping the existing roof.

Project Overview

Fully stripped roof showing exposed old timber roof trusses and rafters with debris during a major re-roofing job in Cumbria

The Problem

This 1960s bungalow near Coniston Water has a large flat roof covering the entire footprint — approximately 80 square metres. The existing three-layer torch-on felt was 18 years old and failing at the overlaps between sheets where the heat-welded bonds had separated, creating channels that directed water under the covering rather than over it. The bungalow sits in one of the wettest locations in England, receiving over 2,000mm of rainfall annually, so even minor roof defects quickly become major problems. Multiple leak points had developed across the living room and master bedroom ceilings. The homeowner contacted us in September, anxious to get the roof waterproofed before the heavy autumn and winter rainfall arrived. A full strip-and-replace with EPDM or GRP would have taken 2-3 weeks given the roof size and the likelihood of weather interruptions — time the homeowner didn't have. The felt substrate, while leaking at the overlaps, was still firmly bonded to the decking beneath, making it a viable surface for an overlay system.

Our Solution

After assessing the felt surface and confirming it was stable and well-adhered, we recommended a Lava20 overlay. We started by cutting out and patching the three worst blistered areas with new felt to create a flush surface, then cleaned the entire roof with a fungicidal wash to remove algae and moss. A bonding primer was applied across the full area, followed by the three-coat Lava20 system with polyester fleece reinforcement in the first coat. Special attention was given to the former overlap joints — the fleece was laid to bridge every overlap by at least 100mm on each side, ensuring these previous weak points were comprehensively sealed. All upstands at the parapet walls and chimney base received additional reinforcement. The existing lead flashings were in good condition and were incorporated into the Lava20 system by bonding the membrane over the flashing aprons. New leaf guard outlets were installed at the two drainage points. The entire 80m² roof was completed in 4 working days — well ahead of the October weather.

The Result

The bungalow has now been through two full Coniston winters — including periods of sustained heavy rainfall — with zero leaks. The Lava20 membrane has created a completely seamless waterproof envelope over the entire roof, with the reinforced fleece bridging the overlap joints that were the source of all previous leaking. The homeowner described the transformation as remarkable, noting that for the first time in years they could listen to heavy rain without anxiety. The total project cost was approximately 35% less than a full strip-and-replace would have been, and the 4-day completion time was a fraction of the 2-3 weeks that alternative systems would have required. We provided a 20-year guarantee on the Lava20 installation.

Work Carried Out

  • Cut out and patched three blistered areas of the existing felt roof on this Coniston bungalow, creating a smooth, flush surface suitable for the Lava20 overlay application.
  • Cleaned the entire 80m² roof surface with a fungicidal wash to remove algae, moss, and lichen that could compromise adhesion of the Lava20 liquid membrane.
  • Applied bonding primer across the full roof area, chemically activating the felt surface to provide maximum adhesion for the Lava20 waterproofing system.
  • Rolled the first coat of Lava20 with polyester fleece reinforcement, carefully ensuring the fleece bridged every former felt overlap joint by 100mm minimum on each side.
  • Applied additional fleece reinforcement at all parapet upstands, chimney base, and drainage outlet surrounds for extra protection at these critical waterproofing details.
  • Rolled second and third coats of Lava20 at alternating angles to the preceding coats, building up a minimum 2mm cured membrane thickness across the entire bungalow roof.
  • Bonded the Lava20 membrane over the existing lead flashing aprons at the chimney and parapet walls, encapsulating the lead to create a fully integrated waterproof system.
  • Installed new stainless steel leaf guard outlets at both drainage points, bonded into the Lava20 system, and tested the complete roof drainage under sustained water flow.
Large stone or slate hip-roofed Cumbrian building viewed from above showing the pyramid hip corner

Materials Used

Aerial view of Cumbrian terraced rooftops showing mixed natural slate and stone construction from above

Lava20 Liquid Membrane

The Lava20 system applied to this Coniston bungalow is a water-based liquid EPDM membrane that cures by evaporation into a seamless rubber coating. Applied in three coats at an aggregate wet film thickness of approximately 3mm, it cures to a 2mm solid rubber membrane with exceptional elongation properties — stretching up to 300% without tearing. This elasticity is crucial for overlaying existing felt, as any future substrate movement or cracking is easily accommodated without compromising the waterproof layer above.

Polyester Reinforcing Fleece

The 120g/m² non-woven polyester fleece embedded in the first coat provides critical tensile strength at the former felt overlap joints. These joints — where the original felt strips met — were the primary leak paths on this roof. The fleece bridges each overlap by 100mm minimum on each side, creating a reinforced band that prevents any future joint movement from cracking the Lava20 membrane above.

Felt Surface Primer

The specialist primer is formulated to bond to mineral-finished and smooth-surfaced bitumen felts, creating a chemically active layer that the Lava20 liquid membrane bonds to permanently. Proper priming is essential for overlay systems — without it, the membrane could delaminate from the felt surface beneath.

Stainless Steel Leaf Guard Outlets

New 316-grade stainless steel outlets were bonded into the Lava20 membrane at both drainage points, replacing the corroded original outlets. The wide bonding flanges create a watertight seal with the membrane, and the integral leaf guards prevent debris blockages in the downpipe system.

Frequently Asked Questions

Yes, Lava20 is specifically designed for overlay applications on existing felt, asphalt, and concrete flat roofs. As long as the existing surface is stable and well-adhered to the deck, Lava20 bonds directly to it. This eliminates the cost, disruption, and waste of stripping the old covering — as demonstrated on this Coniston bungalow.

Lava20 cures to form a seamless EPDM rubber membrane that is completely impervious to water regardless of rainfall intensity or duration. The fully bonded, jointless construction means there are no weak points where water can penetrate. This bungalow near Coniston receives over 2,000mm of rain annually and has been completely dry since installation.

Typically 30-40% less expensive than a full strip-and-replace with EPDM or GRP, primarily because the existing covering is left in place, reducing labour, skip costs, and material quantities. The Lava20 overlay on this Coniston bungalow saved the homeowner approximately 35% compared to alternatives.

Lava20 requires a dry surface for application and ideally 4-6 hours of dry weather after each coat for initial curing. However, once cured, it is completely unaffected by rain. We monitor weather forecasts carefully and schedule application windows accordingly. In Coniston's climate, we typically work in the drier spells between weather fronts.

Lava20 cures to form EPDM rubber with a documented lifespan exceeding 50 years. The system carries a 20-year guarantee as standard. Because the membrane is fully bonded and seamless, there are no joints or seams that could fail over time — unlike the felt overlay joints that caused the original leaking on this Coniston bungalow.
Mr Roofer UK official company logo showing a red hexagonal badge with crossed hammers and house icon

Need Lava20 Roofing in Coniston?

Our Lava20 specialists provide fast, cost-effective liquid membrane solutions throughout Coniston and the Lake District. Ideal for overlay applications on existing flat roofs. We also offer EPDM, GRP, and felt roofing systems. Contact us for a free roof assessment.

Contact Details
Your Message